PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Finished closing up the block wall at corridor 149 next to sprinkler room Facing East.jpg Installing copper piping at the 1st floor Facing North.jpg Laying out block at 1st floor Intake Room Facing West.jpg Weather strips along the curtain wall South Elevation.jpg Installing copper piping at the 2nd floor Facing North.jpg Welding black iron duct work at the 4th floor Facing South.jpg